Armadale Train Line Concrete U-Drains
The ground was excavated to the specified levels using an excavator, followed by the placement of concrete blinding to the surveyed levels. Formwork was constructed for the rain channel, and the base and walls of the drains were poured using a concrete pump, ensuring proper compaction with vibrator screeds to achieve the required levels. Upon completion, the formwork was stripped, the concrete cured, and the drains backfilled in accordance with project specifications
Location
Armadale, WA
Duration
November 2024 - January 2025