top of page

FMG Christmas Creek Maintenance Work
Supplied skilled labour and plant operators to undertake excavation, compaction, and ground levelling for footpath preparation around buildings, including the use of excavators, loaders, water carts, and tipper trucks. Constructed footpath formwork, installed reinforcement, and poured concrete to specified survey levels. Completed forming, pouring, and cutting of grout beneath steel light post bases, ensuring accurate alignment and a high-quality finish in accordance with project requirements.
Location
Newman, Wa
Duration
May 2024 - December 2024
Project Gallery

bottom of page



