Rio Tinto Cape Lambert F Troop
The team supplied all materials, labour, and supervision to complete the construction of foundations, slabs, retaining walls, footings, thickenings, walkways, ramps, and stairs. Our scope included the supply and installation of reinforcement, concrete, formwork, and cast-in components, along with the use of power tools, plant, and equipment to ensure the works were delivered safely, efficiently, and to specification.
Location
Karratha, WA
Duration
December 2023 - April 2024