Tianqi Lithium Energy Australia Debottlenecking Project
At the Tianqi Lithium Kwinana facility, Glenview Construction carried out extensive civil and structural works essential to the plant’s operation. This included detailed earthworks to excavate and prepare foundations for all structures. This included the installation of two tank bunded slabs with retaining walls around their perimeters, and the construction of suspended Bondek slabs supported on steel girders, with plinths installed on top to accommodate the crusher.
Location
Kwinana, WA
Duration
September 2025 - February 2026